Internal · Not for distribution
Review checklist for the Studio draft.
What this draft contains, what it deliberately leaves open, what is placeholder, and what needs approval before anything is published or shared outside the review group.
- Publication
- Not published
- Analytics
- Disabled
- Domain
- None connected
This page is an internal review aid. It is linked from the footer only and should be removed, or kept behind access control, before any wider distribution of the site.
01
Pages and sections created
Seven site pages plus this internal review page. All content is static; no analytics, tags, pixels, or third-party scripts are loaded.
Home — restrained hero with primary CTA “Discuss a Problem” and secondary “See How the Studio Works”, four-stage overview, decision-gate callout, positioning statement, stopping-early rationale, audience, and a claims-boundary section.
DoneThe Studio Model — four hypothesis sources, separation-before-development rule, what the Studio provides, and a partner-commitment caveat.
DoneHow Concepts Advance — four stage blocks with purpose, proposed planning range, gate to advance, and the Thesis questions; stop criteria; planning-range disclaimer.
DoneProblem Areas — “under review” state, one clearly labelled illustrative card, the full twelve-field card structure, and the status vocabulary.
DoneFounders and Design Partners — founding CEO responsibilities, design partner participation, and the private-draft inquiry form with required acknowledgment.
DoneGovernance and Boundaries — eight safeguards, the no-affiliation statement, and the Ventures separation note.
DoneContact — three engagement routes, the inquiry form, disclosure notices, and pending direct contact details.
DoneShared elements — persistent draft-status bar on every page, navigation with skip link, footer disclaimer, per-page titles and descriptions, noindex directive.
Done
02
Problem areas left undecided
The brief explicitly withholds these decisions from the draft. Nothing here should be treated as a selected thesis.
The first two or three problem areas have not been approved. Leadership decision required before any card is populated.
UndecidedNo problem area has been assigned a current stage, decision owner, or next gate.
UndecidedNo market size, buyer commitment, partner commitment, or company name is stated anywhere on the site.
UndecidedThe card component supports all twelve required fields and is ready to receive approved content.
Done
03
Placeholder copy and assets
Logo: the KeyMaker Studio lockup is in use in the header and footer, set on its own Pale surface so the mark keeps its intended contrast on Midnight. Confirm the lockup is the approved master artwork before publication.
Needs approvalImagery: three abstract material studies — light through glass, drafting lines under warm light, steel meeting glass. No patients, clinicians, facilities, client material, or portfolio companies.
DoneProblem area card: one illustrative card is shown and labelled “Illustrative placeholder — remove before publication”.
Needs approvalContact details: no email address, phone number, or office location is published.
Needs approvalNo testimonials, client or partner logos, screenshots, portfolio cards, founder names, traction metrics, investment terms, or efficacy claims appear on the site.
Done
04
Form destination and access controls
Inquiries are stored in the app’s own database — never emailed or posted to a third party or an advertising platform.
Submissions are stored in the app’s own StudioInquiry records. No third-party form service, advertising tool, or email delivery is connected.
DoneAccess control: only app administrators can read, update, or delete submissions. A visitor can create a submission and cannot read any submission back, including their own.
DoneThe form has no file upload, no URL parameters for submitted content, and no logging of submitted values.
DoneThe PHI and confidentiality acknowledgment is a required field, and submission is blocked without it.
DoneShared-inbox notification is not configured. If Studio wants an email alert on new inquiries, an approved recipient and a connected sending domain are needed first.
PendingNo spam protection or rate limiting is configured on the form.
Pending
05
Privacy, analytics, and domain settings still pending
Analytics: disabled. No analytics provider, tag, pixel, or session recording is installed, and the site sets no cookies.
PendingPrivacy notice and terms: not drafted. Required before any wider distribution or publication.
PendingDomain: no custom domain is connected. The site remains unpublished.
PendingSearch indexing: a noindex, nofollow directive is set as a precaution. Confirm the intended visibility at publication.
PendingAccessibility: keyboard-accessible navigation and forms, visible amber focus indicators, semantic heading order, reduced-motion support, and AA-contrast text are in place. A formal audit has not been run.
Pending
06
Needing Ricardo’s approval
Positioning statement, hero headline, and supporting copy.
Needs approvalStage names, proposed planning ranges (2–4, 6–8, and 10–12 weeks), and the gate criteria for each stage.
Needs approvalStop criteria wording and the statement that stopping preserves resources.
Needs approvalProblem areas: which two or three to open first, and the decision owner for each.
Needs approvalFounding CEO and design partner language, including the no-guarantee clause.
Needs approvalGovernance safeguards and the no-affiliation statement.
Needs approvalPartner references: CodeConductor and Red Blink are described here only as a “proposed partner role, subject to agreement”. They are intentionally not named on any public-facing page.
Needs approvalVentures: the proposed Ventures arm is deliberately excluded from this site and will have its own instructions.
Needs approvalLogo asset, contact details, privacy notice, analytics decision, and whether the site is published at all.
Needs approval
Nothing in this draft is published, and no claim on the site should be treated as approved until the items above are signed off.
Draft · November 2026